November 16, 2005 Katherine Trinidad Headquarters, Washington (Phone: (202) 358-3749) George Diller Kennedy Space Center, Fla. (Phone: (321) 867-2468) STATUS REPORT: E05-018 NASA EXPENDABLE LAUNCH VEHICLE STATUS REPORT: E05-018 Mission: Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations & CloudSat Launch Vehicle: Boeing Delta 7420 with Dual Payload Attach Fitting Launch Pad: NASA's Space Launch Complex 2, Vandenberg Air Force Base, Calif. Launch Date: TBD Launch Window: 5:01 a.m. EST CALIPSO and CloudSat are installed within the Dual Payload Attach Fitting at the Astrotech payload processing facilities. The payload combination will be placed in an environmentally-controlled canister and installed on the payload transporter for the trip to the launch pad. Delta II preparations at Complex 2 are on hold until the payloads arrive for installation on the second stage. Preparations can resume when the Boeing technicians' strike is resolved. Mission: New Horizons Launch Vehicle: Lockheed Martin Atlas V 551 (AV-010) Launch Pad: Complex 41, Cape Canaveral Air Force Station, Fla. Launch Date: Jan. 11, 2006 Launch Window: 2:08 to 4:07 p.m. EST The bottom portion of the payload fairing was installed this week on the Atlas V. A Launch Vehicle Readiness Review was successfully completed Tuesday. The fit check of the Radioisotope Thermo-electric Generator power system with the spacecraft was performed last week. The generator will be installed for flight at the launch pad. A “dry” spin balance test of the spacecraft will be completed this week. After Thanksgiving, hydrazine fuel for attitude control and course-correction maneuvers will be loaded on the spacecraft and a “wet” spin balance test performed. For prior status reports on the Web, visit: http://www.nasa.gov/centers/kennedy/launchingrockets/status/2005 -end-