Follow this link to skip to the main content

NASA - National Aeronautics and Space Administration

  • NASA Home
  •     >    Missions
  •     >    Space Shuttle
  •     >    Space Shuttle Era
  •     >    Multimedia
  •     >    Gallery
  •     >    Enterprise
    • Send
    • Print
    • Follow this link to Share This Page
      Share

Enterprise on crawler

Download Image

› Full Size› 1600 x 1200› 1024 x 768› 800 x 600

Enterprise on a Slow Roll

(Archival) KSC Space Shuttle Orbiter Enterprise, mated to a 15-story-tall external propellant tank and twin inert solid rocket boosters on top of a Mobile Launcher Platform, is rolled back to the Vehicle Assembly Building from Lauch Complex 39's Pad A July 23 at the completion of nearly three months of fit and function checks at the shuttle launch site as part of the exercise designed to help clear the way for the liftoff of its sister ship Columbia. The massive Crawler Transporter began moving its 11 million-pound load the 3.5 miles from pad A to the VAB at 10:23 a.m. and reached the doorway to High Bay 1 at 3:48 p.m. following serveral days of fit checks of modified platforms in the assembly bay, the nonlaunchable shuttle will be destacked. Enterprise will be returned to Rockwell International and stripped of parts for integration into orbiter destined for space, while the external tank and solid booster will be returned to their respective prime contractors and refurbished for use on a later shuttle mission.